This is one of most widely used features of BIM. PBIMIS has a dedicated team for Clash detection (when two or more elements cross or, ocupy the same area. An Hard Clash - sever level, might indicate a duct that colides/overlaps with a beam or pillar running through a wall) . Our customized clash reporting format, clash tracking system and accurate detection of clashes makes this, one of the most desired services.